Fit safety covers over core holes. Set-UP For Spotter Set up scaffolding at correct height in order to safely control core when it comes free of hole. Only work from a ladder if a scaffold cannot be set up in work area. If using a ladder install an expansion anchor in the floor slab that is capable of

All the necessary machines and equipment will be installed, following the procedures involved in coring and demolition / cutting the concrete Columns. The column will be cut above from 1.5m. Prior to start cutting, the marking will be done on the existing concrete Columns. The column will be cut 150x150x150 one meter down from top from all ...

3 Method of Statement Core Drilling Works DOC: -300-MC-MST-000XX REV: 000 DATE: 27.12.2017 PAGE: 4 / 7. 9.2.2. Unauthorized persons shall be excluded from the area. 9.2.3. Adequate caution boards and warning signs shall be provided. 8.2.4.

i want a method statement and work methodology for concrete, slab cutting using a diamond saw cutter . Skills: Building Consulting, Civil Engineering, Construction Monitoring, Engineering Location: United States See more: concrete coring procedure, core drilling safe work method statement, concrete core cutting method, risk assessment for core cutting, risk assessment for concrete coring ...

method statement and are familiar with the reporting and emergency procedures 8. All supporting documentation should be read prior to works i.e. Method Statement, JSSP, Construction Drawings etc. 9. Erect all necessary signage to serve notification that construction work, particularly excavation work is in progress in accordance with chapter 8 10.

HOLLOW CORE SLABS SECOND EDITION by Donald R. Buettner and Roger J. Becker Computerized Structural Design, S.C. Prepared for the PCI Hollow Core Slab Producers Committee John E. Saccoman, Chairperson James Beerbower Ernest Markle Kevin Boyle James Markle Jeffrey Butler Milo J. Nimmer Loris Collavino William C. Richardson, Jr. Edward J. Gregory ...

Oct 31, 2015· Method Statement Coring. A) Mark out the position to be cored.B)Ensure that there is no services infront and behind the location to be cored.C)Move away or protect thing that is directly underneath the area to be cored.D)Drill and install wall anchor.E)Mount coring machine stand.F)Fix the core bit to the machine.G)Adjust and center the corebit ...

Sep 25, 2008· RE: Coring through rc slab. JKW05 (Structural) 21 Aug 08 12:27. With a beam and slab system, coring near the columns is less of a concern (I'm assuming the cores are not through the beams). Locating the rebar would be helpful, as a 3-inch or 6 …

Dec 22, 2018· Complete template of method statement along with the related attachments can be downloaded here. Structured Method Statement for the Repair of Concrete. I. Description of Works 1. Introduction This method statement defines the sequence and the control procedures for the repair of concrete defects which include but not limited to the following: 1.

• core drilling • concrete slab cutting • concrete wall cutting • concrete pipe cutting ... construction work, so a safe work method statement must be prepared and followed (see Section 2.2). ... All concrete cutting or coring should be done in accordance

The diagrams below illustrated the sequence of installation for the precast beam-slab system: The Procedure • Setting Out 1. Surveyor to set cross reference. 2. Transfer grid and mark wall position on slab. 3. Mark 100mm offset line from rear building edge. 4. Offset wall position by 200 mm. 5. Secure 2x2 timber to the floor at wall edge to ...

Safe work method of statement for the production & erection of precast concrete boundary wall for the project. PRODUCTION SEQUENCE 0Moulds to be used for casting precast units shall be constructed properly to achieve required finishes and dimensions …

2.0 SCOPE This Method Statement applies to all the civil works - Excavation including ground preparation, setting out, backfilling, soil compaction, concreting, waterproofing, masonry, plastering, joinery, painting and GRC works - related to the construction of building as per project requirements, referring with approved Civil and MEP drawing.

The simplest type of two-way slab to construct is known as a flat plate.These slabs are supported directly by the columns and have a completely flat soffit. For live loads of about 50 psf (2.5 kPa), column spacing typically ranges from 15 to 25 ft (4.5 to 7.5 m) with mini-mum slab thicknesses of 6 to 10 in. (150 to 250 mm).1 For longer

Method Statement for Production of Hollow Core Slab. Hollow core slab production and installation method of statement is given below for your use as a sample for different projects. Ensure all clearances from the concerned Government Department obtained. Selected working area should be barricaded to avoid accidents & damages.

Core sample - Wikipedia sample, to reduce changes from the coring process. it is common practice to "slab" them - cut . Developers Cookie statement Mobile view.

Oct 17, 2018· As the name implies, wall sawing is a method for cutting through walls. Contractors sometimes use this method for cutting floors instead of slab sawing. For example, if you have a floor that is steeply sloped, a flat saw won't work for the job, but a wall saw will. Wall sawing is also used to make openings in ceilings.

The works referred to in this Method Statement are the soft stripping, demolition of the buildings including the removal of all foundations and footings to a depth of 1.5mts below slab level. 2.2 Time and duration . Commencement and duration of works will be detailed on …

Method Statement for Pouring Concrete on Slab on Grade. Feb 11, 2014· Method Statement for Casting Slab on Grade. 2. Purpose and scope. The purpose of this method statement is to explain the proper procedure on how to prepare and cast slab on grade or any horizontal element or member including fixation of steel reinforcement, MEP embedment's, fixing of shutter etc. without injuries.

Work Method Statement For Coring Works ( A ) October 2019 781. Method Statement For Welding.pdf. August 2019 408. 015-method Statement For Painting Works (building).pdf. July 2020 234. Method Statement Hdpe - Kucp. July 2019 428. Method Statement Fence Type Iv.

May 21, 2017· Hollow core slab Advantages : Hollow core ribbed slab not only reduces building costs it also reduces the overall weight of the structure. Excellent fire resistance and sound insulation are other attributes of hollow core slab due to its thickness. It eliminates the need to drill in slabs …

The Concrete Cutting / Core Drilling Safe Work Method Statement breaks the concrete cutters work activity into logical job steps, lists the typical hazards associated with each of these steps, and describes the control measures implemented to eliminate or control the risk for the concrete cutters safety.

Start the coring machine. Turn on the water system and start coring. Once cored through, stop the motor and water. Remove drill motor and diamond bit. Remove cored concrete core. Clean up area and move to the next location. Note: For coring thru slab, ensure that all protection at floor below is done.

hollow-core slab Echo Floors All slabs 4.5m and over should be propped in the centre during the casting of the joints (one prop per panel). All slabs over 5.0m require a structural concrete topping in addition to grout in the joints. Props should be left in position for a minimum of

METHOD STATEMENT: ELECTRICAL WORKS. Page 6 of 31 Method Statement Electrical Works . 5.4 Fixing Conduits and GI boxes in the columns . Before casting any column in the site, we have to check if there is any Switch Socket, bell or break glass fixed on the column. If there is any, we have to fix

Mar 10, 2019· 2. Scope. The Scope of this method statement covers the various requirements to be provided for preparation like chipping and expose the existing rebar, marking to position the new starter bar location, reconnaissance to confirm and ensure that the existing rebar or PT tendons (in case of PT slab) don't get disturbed and then do core drilling to required depth.

Aug 13, 2014· Method Statement For Concrete Coring & Cutting Before commencing any activity on site, the consultants must be notified. All the related documents, shop drawings, method of statements, material approvals, subcontractor's approvals and test certificates etc. …

the method statement and risk assessment. • The LS/SF will then direct the crane into its predetermined rigging position as shown on the attached lifting plan. The crane operator to then rig the crane in accordance with manufacturer's instructions with the help of the Floorspan Contracts operatives if required. Fall arrest air bags can now be